Project
name: Al-Qasim Bridge in Ramadi
Client: Al-Anbar Governorate
POC: Al-Anbar Governorate
Description:
The project Consist constructs Bridge with
6 spans of 24 m each i.e the total length
is 144m. The width of the bridge is 21m
with 2side walks 1.5 m , 2carriage ways
8.50 m each & one median of 1 m width.
The substructures of the bridge are large
diameter piles (1.50 m in diameter) ,1,2m
in diameter reinforced concrete column &
1.20* 1.20 m reinforced concrete cross beam.
To create a beautiful image, the design
of the Bridge should consist in special
consideration in the entrance & exit
of the Bridge.
Project
Staff details: A site office with
highly experienced engineers and technicians
managed the site activities. Outside Iraq,
our offices supported the project by purchasing
equipment and instruments, The Baghdad HQ
supported vital administration and correspondence.
The site staff was mainly from the local
area to encourage employment in war affected
area. A total of 4 engineers, 25 technicians
and 3 administrative personnel are covered
project activities.
Starting
Date: 25-01-2011
Completion date: Nov. 2011